Time for a Third Bridge to Vancouver

CascadeNewLogoBy John A. Charles, Jr.

Recently a conceptual plan for a new bridge over the Columbia River was unveiled at a public forum in Vancouver, WA. The plan, presented by Florida-based Figg Engineering, calls for a four-lane bridge east of I-205. The new bridge would have 144 feet of river clearance – the same as the I-205 Bridge — and include sidewalks and bikeways completely protected from highway traffic.

The financing is still to be determined, but could involve user fees, known as tolls. In fact, one option would be for the bridge to be privately owned and operated, paid entirely with tolls. Those drivers unwilling to pay could continue to use the Glenn Jackson Bridge, as they do today.

Oregon political officials are notably cold towards the idea of a third or fourth bridge over the Columbia. Local politicians believe that the two bridges we have now are all we should ever get – even though Portland is served by nearly a dozen bridges over the smaller Willamette River.

As the Portland-Vancouver region grows we will need much more bridge capacity. Since government won’t provide it, we should welcome this opportunity to pursue a private investment option.

John A. Charles, Jr. is President and CEO of Cascade Policy Institute, Oregon’s free market public policy research organization.

Share